Trial by water

By Zhang Lei | China Daily | Updated: 2021-02-20 09:30
Share
Share - WeChat
Workers take a bus to the No 4 inclined wellhead of the Qinling Mountains Water Conveyance Tunnel with a length of 5,820.21 meters, Nov 18, 2020. [Photo/Xinhua]

The poor working environment has made some workers quit every month, but most workers still stick to the "hot" position. On a cold winter day, taking a cold shower in a crude shower room in the tunnel has become their most pleasant moment of the day.

Accompanied by the thunderous rumbling and vibration of the tunnel borers, the tunnel advances day by day, but what remains unchanged is that when the workers safely end their day's work by taking 20-minute tunnel car and a 30-minute bus ride, the whole crew cheers.

|<< Previous 1 2 3 4 5 6 7 8 Next   >>|
Photo
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US