A passenger ship sails into the fourth chamber of the permanent ship lock as a gate opens at the Three Gorges Dam in Yichang, Hubei Province, June 16, 2003. The third trial navigation of the Three Gorges Project was pronounced successful as ships passed through the permanent locks Monday morning without hindrance. [Xinhua]
 
 
 

Copyright 2002 By chinadaily.com.cn. All rights reserved.