Back to the grind

China Daily | Updated: 2020-05-01 10:12
Share
Share - WeChat

With the novel coronavirus outbreak largely contained in China, work and production have gradually resumed in many sectors. Construction work for the Beijing 2022 Winter Olympic Games and the second phase of the National Convention Center project resumed in February. To ensure the safety of the workers, stringent measures such as temperature readings, face masks and controlled meal services have been implemented at the sites. A total of 24 out of 25 construction projects have resumed in downtown Beijing and the capital's Yanqing district. Beijing will be the first city in the world to host both the summer and winter Olympic Games. China Daily's photographer Kuang Linhua has captured these images of projects.

A welder works on the steel rooftop of Beijing's National Convention Center on April 14, with the Bird's Nest in the background. The construction work is the second phase of a project to expand the convention center. [Photo by Kuang Linhua/China Daily]
1 2 3 4 5 6 7 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US