Bullet trains launch on Xining-Golmud section of Qinghai-Tibet Railway

Xinhua | Updated: 2023-07-02 07:28
Share
Share - WeChat
An attendant interacts with passengers on Fuxing bullet train C891 on the Xining-Golmud section of the Qinghai-Tibet Railway on July 1, 2023. [Photo/Xinhua]

The Fuxing bullet train, with a designed speed of 160 km per hour, is designed for the high-altitude and low-temperature environment along the Xining-Golmud section. With the performance of anti-ultraviolet light, anti-wind and sand, it can meet the operation needs of 3,500 meters above sea level.

In July 2006, the Qinghai-Tibet Railway linking Lhasa, capital of Southwest China's Tibet autonomous region, and Xining went operational, ending the pre-railways period in Tibet.

|<< Previous 1 2 3 4 5 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US