Power restored in Chongqing district after 296mm two-hour deluge

By Deng Rui and Tan Yingzi in Chongqing | chinadaily.com.cn | Updated: 2026-05-28 18:43
Share
Share - WeChat
Technical staff from the Yongchuan subbranch of State Grid Chongqing Electric Power Company repair power facilities at Anxi village, Chashanzhuhai subdistrict of Chongqing's Yongchuan district. [Photo by Lai Xiaolong/For chinadaily.com.cn]

On the ground, safety and technical supervision personnel were well-prepared, with logistical support such as vehicles, supplies, and heat prevention materials in place. Despite difficult road conditions and communication issues, the repair operations advanced smoothly.

With the immediate crisis managed, attention now turns to follow-up work. This involves removing collapsed poles, reinforcing damaged structures, and enhancing inspections and hazard assessments in areas prone to geological disasters. These steps are crucial to ensure the stable operation of the power grid and to prevent future disruptions.

|<< Previous 1 2 3 4 Next   >>|
Photo
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US