Large Medium Small |
|
A man passes the demolition site of two buildings in Ningbo's downtown area on March 31, in Zhejiang province. The 11-storey and 21-storey buildings were demolished at 5: 30 am on March 31 by directional blasting. The demolition makes room for the construction of Ningbo's subway line 1. [Photo/CFP] |
分享按钮 |