Video
 
News
Xi'an Subway Line 2 makes big strides
2010-08-26

Construction of Xi'an Subway Line 2, carried out by the Third Engineering Group of China Railway, has come a long way, as the left lane of the tunnel - from Daminggong West Station to Beida Street Station—reached completion on October 25.

"We have invested over 300 million yuan into this lane—that is the biggest amount among all the lanes," said Wang Xuejun, deputy general manager of the Third Engineering Group of China Railway. "Also, it runs the longest—3.7 kilometers of all the Line 2 tunnels."

Line 2 will take a north-south orientation and run 62.8 kilometers, carrying over 55% of public transport passengers on the roads above.

A substantial underground network would be a boon for Xi'an, as when finished, it will help alleviate transport pressure on the main roads in this ancient city.

Up to now, the double track tunnel between Convention & Exhibition Center Station and Zhangjiabao Station has been joined.

Line 2 is scheduled to open at the end of 2011.

By Yuan Yue (China Daily Shaanxi Bureau)

 

| About China Daily | Advertise on Site | Contact Us | Job Offer |

Copyright 1995 - 2010 . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to
China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form.
Note: Browsers with 1024*768 or higher resolution are suggested for this site.