Bakun-Similajau Power Transmission Project, Malaysia
Two 275 KV transmission lines from the Bakun switchyard via the Similajau substation to an aluminum smelter, for a total length of 281.5 km.
Involvement: construction, installation
POWERCHINA brings mutual benefits.
POWERCHINA provides full range of services and products.