Water environmental protection and water resources multiple purpose project
Updated: 2014-05-18 16:38
Construction site: Hi-Tech Industrial Base (86.88 sq km)
Brief introduction: The project will build an aquatic science application demonstration base to distribute the existing water system in a rational way and improve the rainwater collection system and reclaimed water recycling system.