xi's moments
Home | Society

New subway line drilled through in Beijing

Xinhua | Updated: 2024-10-22 11:17

BEIJING -- The entire tunnel of Beijing Subway Line 17 was drilled through after the middle section of the tunnel was bored through on Monday, its builder China Railway 14th Bureau Group Corporation Limited announced.

Beijing Subway Line 17 is a major transportation artery that runs north to south in the Chinese capital, where about 21.9 million people live.

With a total length of 49.7 kilometers, Line 17 is designed to have 21 stations. The northern and southern sections of the line opened to traffic in 2023 and in 2021.

Once the entire line is operational in the future, it is expected to alleviate traffic pressure on Line 5 and Line 10.

Global Edition
BACK TO THE TOP
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349