xi's moments
Home | Society

Shanghai East Railway Station completes 9,000-ton steel roof lift

By Zheng Zheng in Shanghai | chinadaily.com.cn | Updated: 2026-05-14 17:07

A 9,000-ton steel structural roof truss is lifted 13.5 meters into position at Shanghai East Railway Station. [Photo by Gao Erqiang/chinadaily.com.cn]

The station will feature 15 platforms and 30 tracks across more than 1.3 million square meters, with the main terminal occupying 160,000 square meters.

The six-story building, featuring three levels above and below ground, will combine national railways, regional railways, urban rail transit, and aviation check-in services under one roof.

Shanghai East Railway Station will introduce China's first air-rail transport integration module in a major hub, positioning passengers just 250 meters from railway exits to underground aviation security checkpoints. This connection links with Shanghai Pudong International Airport, located five kilometers away.

Construction remains on schedule for the July 2027 opening. When finished, Shanghai East Railway Station will connect to the Shanghai-Suzhou-Nantong Railway second phase, the new Shanghai-Hangzhou High-Speed Railway, and other major lines.

|<< Previous 1 2 3   
Global Edition
BACK TO THE TOP
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349