Home/News
According to China Gezhouba Group Co. The company signed with the Drainage Bureau under Mauritania Ministry for Hydraulic and Energy a contract agreement, which is about the phase one of the municipal drainage system of Nouakchott, the capital of Mauritania.
The EPC contract, signed on Feb 5, 2010 in Nouakchott and worth 1.362 billion yuan ($224.36 million) in total, provides that CGGC will be responsible for the design, procurement and construction of the project.
The 42-month-long project will mainly include the design, material supply, construction, or installation and commissioning of such facilities as sewage pipe network, rainwater pipe network, sewage pumping station, rainwater pumping station/ infiltration pond, sewage treatment plant, and the office building of the Drainage Bureau.
Links Privacy Statement Terms of Use Contact Us
Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.