Home / Our Business / Hydropower

Hydropower

CGGC provides the society with excellent hydropower-related products and services by relying on its core technologies, rich experience, advanced equipments and outstanding management team. CGGC has built over 150 large-scale hydropower projects including the Three Gorges Project, which is the world's largest hydropower project and represents the top-notch technology in the field of dam building in the world. CGGC builds hydropower projects all over the world. CGGC boasts world-leading river closure technology, large-scale hydropower unit installation technology, gate installation technology, concrete temperature control and rapid construction technology, and is capable of building various hydropower projects in the world.

 

The Three Gorges Water Conservancy Project (China)

CGGC constructed the largest hydropower project in the world.

Read more

 

The Gezhouba Water Conservancy Project (China)

In the early 1970s CGGC constructed the then largest infrastructure project in China.

Read more

 

Shuibuya Hydropower Station on the Qingjiang River (China)

The Qingjiang Shuibuya Hydropower Station built by CGGC has the world's highest concrete face rock-fill dam.

Read more

 

Yele Hydropower Station (China)

Yele Hydropower Station built by CGGC has an asphalt concrete core wall rock-fill dam that stands at the highest altitude in the world among similar dams.

Read more

 

Jinping Stage-I Hydropower Station (China)

The dam of Jinping Stage-I Hydropower Station undertaken by CGGC is the world’s highest double-curve thin arch dam ever built, under construction or in design

Read more

 

Longtan Hydropower Station (China)

The dam of Longtan Hydropower Station undertaken by CGGC is the highest roller-compacted concrete dam in the world.

Read more

 

Geheyan Hydropower Station (China)

The whole project undertaken by CGGC won the “Luban Award”, the top construction and engineering quality award in China.

Read more

 

Daguangba Hydropower Station (China)

The dams consist of the concrete dam and the monozone dam, with the total length of 5,842m. The concrete dam is 719m long, with crest at EL.

Read more

 


   Previous 1   

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.