Home/Our Business/Equipment Installation
The 550MW water-turbine generator units at the Ertan Hydropower Station had the largest single-unit capacity in China in the twentieth century. The consortium led by CGGC installed as many as four 550MW units for one single hydropower station in one installation workshop within one year, creating a national record in this field.
Electromechanical Equipment Installation at the Ertan Hydropower Station |
Links Privacy Statement Terms of Use Contact Us
Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.