Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Shuibuya Hydropower Station (China)

Updated: 2014-04-01

CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.