Home / Our Business / Equipment Installation
Equipment Installation
CGGC was the general contractor of FAN Hydropower Station in the form of EPC and undertook all the installation work of its electromechanical equipment and sub-systems.
As general contractor of the Houay Lamphan Gnai Hydropower Station in the form of EPC, CGGC undertook the supply, installation and debugging of two 44MW impulse turbine generator units and subsystems.
The Wangfuzhou Hydropower Station is equipped with four 27.25MW bulb tubular units to reach a total installed capacity of 109MW, generating 581 million KWH of electricity per year.
CGGC installed two 120MW high-head impulse turbine generator units (with a maximum water head of 640m) for this project, China's then largest Pelton turbine generator units in terms of single-unit capacity.
Links Privacy Statement Terms of Use Contact Us
Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.