xi's moments
Home | Companies

Sinopec connects geothermal power generation project to grid

By Zheng Xin | chinadaily.com.cn | Updated: 2024-10-25 10:47

The company logo of Sinopec Corp is displayed at a news conference in Hong Kong. [Photo/Agencies]

China Petroleum & Chemical Corp, or Sinopec, saw its first geothermal power generation demonstration project connected to the grid and started generating electricity recently, amid China's commitment to diversifying away from traditional oil and gas operations.

Located in a geothermal field in Xianyang, Shaanxi province, the project, combining low-temperature power generation, helium gas extraction from geothermal water, and heating, holds significant importance for expanding the geothermal energy industry chain and optimizing the energy structure, said the company.

The project has a heating capacity of 170,000 square meters and an annual power generation capacity of about 700,000 kilowatt-hours, which will provide a consistent energy source that enhances China's energy security while reducing dependence on fossil fuels, it said.

zhengxin@chinadaily.com.cn

Global Edition
BACK TO THE TOP
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349