xi's moments
Home | Society

State Grid Chongqing completes first annual maintenance of Yubei converter station

By Deng Rui and Tan Yingzi | chinadaily.com.cn | Updated: 2026-06-29 18:56

In preparation for the summer demand period, State Grid Chongqing Electric Power Company completes the first annual maintenance of its Yubei converter station. This effort involved over 2,000 inspection and maintenance tasks, reducing equipment risks and boosting the station’s operational reliability. [Photo by Zhang Lei/For chinadaily.com.cn]

In preparation for the summer demand period, State Grid Chongqing Electric Power Company has completed the first annual maintenance of its Yubei converter station. This effort involved over 2,000 inspection and maintenance tasks, reducing equipment risks and boosting the station's operational reliability, the company said on Saturday.

The station is a critical component of the Hami-Chongqing ±800 kV ultra-high voltage direct current (UHVDC) transmission project. Originating from the Balikun Converter Station in Hami, Xinjiang Uygur autonomous region, this project stretches 2,260 kilometers across Gansu, Shaanxi, and Sichuan provinces to deliver wind and solar power from the Gobi Desert to industrial centers in the southwest.

1 2 3 Next   >>|
Global Edition
BACK TO THE TOP
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349