On Nov 16, the CGGC-constructed FAN Hydropower Station in Ethiopia saw installment of two main transformers.
Islamabad time Nov 8, CGGC Vice President Nie Kai visited Pakistani President Asif Ali Zardari in his office.
On Nov 5, Li Ruogu, president of the Export-Import Bank of China paid an inspection to CGGC construction site in Tatay Hydropower Station, Cambodia.
On Nov 1, the water tunnel No.1 in ChameliyaHydropower Station completed its upstream section, symbolizing a key progress of the project undertaken by CGGC.
On Oct 25, CGGC won the bid for the client camp site project of Tatay Hydropower Station in Cambodia.
On Oct 27, the first rotor was successfully hoisted in Shwegyin Hydropower Station, Myanmar. CGGC worked as the designer, supplier and installer of the whole set of mechanical and electrical equipment.
At 9 o'clock am, Oct 22, a ceremony was held on site to celebrate the combining to grid of the Shwegyin Hydropower Station in Myanmar which is contracted by CGGC
On Oct 22, CGGC reached contracts valued $131 million with China Huadian Engineering Co (CHEC) in Beijing.
On Oct 13, the concreting for the last hollow-core slab was finished in the prefabrication plant on the north side of Bamako No.3 Bridge undertaken by CGGC.
A delegation consisting of the senior advisor of Ghanaian President, Minister of Trade and Industry, Minister of Energy and other important political figures visited CGGC on Sep 26.
Links Privacy Statement Terms of Use Contact Us
Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.