| Updated: 2017-01-26 09:40:34 | (chinadaily.com.cn) |
On Jan 22 the construction site of Liu Weilu station on subway line four in Tianjin achieved "Five one hundred percents": the construction site was one hundred percent surrounded by a retaining structure;the raw materials were one hundred percent covered;100 percent of the construction vehicles were washed;the construction site was one hundred percent hardened;and the earthwork was one hundred percent wet mixed. [Photo/Xinhua by Zhang Bo] |
Because Yangguangleyuan station of subway line six is near residential areas, a noise monitor has been installed. [Photo/Xinhua by Zhang Bo] |
The data of noise detection transfers in real-time to the Tianjin Environmental Protection Bureau. Tianjin has opened five subway lines with a total distance of 168 kilometers. A line of 213 kilometers is under construction, and a 142 kilometer line is planned. It is expected that 336 kilometers of subway will be completed in 2017. [Photo/Xinhua by Zhang Bo] |
On Jan 22, heating station staff monitor the boiler. In 2016, 11 boiler plants were replaced, lowering consumption of coal by 250 thousand tons and reducing carbon dioxide emissions by 500 thousand tons, soot emissions by 3,700 tons, sulfur dioxide emissions by 370 tons, and NOx emissions by 750 tons. [Photo/Xinhua by Zhang Bo] |